Proactive Project Manager experienced in managing a variety of construction teams and projects. Successful in creating effective communication between personnel, sub contractors and the management team. Well experienced in all aspects of general construction projects.
Overview
8
8
years of professional experience
1
1
Certification
Work History
Project Manager- MEP
ANJ Turnkey Project Pvt. Ltd.
05.2018 - Current
Coordinate with design development team and consultants during the development of schematics.
Evaluate the schematic design documents for the feasibility of the MEP services.
To review MEP drawings from architects / consultants and provide valuable inputs with regards to services to ensure that there are no gaps / omissions and the optimum services are being considered for execution of the job.
Value engineering and provide guidance to concerned with all aspects of services to ensure effective decision making.
Assist the Contracts team in preparing cost estimates, budgets, etc. as a subject matter expertise to ensure that there is no major deviations in cost estimates and also to provide feedback on services in existence and their durability / efficiency.
Monitor work of contractors, to ensure that proper methods and technologies are being adapted while installation / execution of services to ensure durability / smooth functioning of equipment / resources and also there are zero / minimum maintenance required in the longer run.
Attend meetings Project review meetings to monitor site progress and resolve issues, if any. Prepare various MIS and circulate to all concerned. Monitor budget for all MEP works and certification of bills, claims, etc by contractors.
Maintain knowledge of modern maintenance techniques, machinery, processes and equipment related to services and recommend the best possible / optimum systems to be implemented so as to enhance the effectiveness of MEP services.
Coordinate with internal team, consultants, contractors for execution of the MEP works and troubleshooting of hurdles / problems, if any to ensure that the project is not delayed and ensuring that the MEP works are carried out as per standards and in accordance with the Project timelines.
Electrical Site Engineer
Kilburn Engineering Limited
07.2017 - 04.2018
Direct managing and Supervision for the Electrical work to maintain the performance on jobsite.
Coordinate with contractors for Electrification, Execution, Erection & Commissioning.
Prepare technical documents & ensure that the work was carried in accordance to the Drawings & Specifications.
Reviewed and corrected site drawings, redlined, and produced hand-drawn field sketches to meet industry standards.
Resolved site issues to prevent delay.
Maintain the Safety measure on site.
Junior Engineer
Goemeneasz India
09.2016 - 06.2017
Inspection of wiring Diagrams and Electrical Control Panels.
Final Testing of Electrical Control Panels as per CE Standards.
Insulation Resistance Test (IR Test)
High Voltage Test (HV Test)
Earth Leakage Current Test
Temperature Rise Test
Ground Continuity & Input current Test
Hazardous Test Current/Voltage Test
EMF Test
Noise Test
Documentation and Certification of Electrical Control Panel as per the standards conformed.
Education
Bachelor of Engineering - Electrical Engineering
University of Mumbai
Mumbai
Bachelor of Science -
State Board of Maharashtra
Mumbai, India
Skills
MEP Execution
MS Office proficient
Subcontract management
Organized and detail-oriented
Superb management skills
Project budgeting & Cost Control
Accomplishments
Project Handled:
Reliance Twin Tower- 3.20 Lakh Sq. ft. - 38 Cr- 180 Days
MMHL- 9,600 Sq. ft. - 3.8 Cr- 60 Days
K Raheja (Phase-01)- 30,500 Sq. ft. - 14 Cr- 90 Days
Credit Suisse- 5,800 Sq. ft. – 2.6 Cr- 45 Days
FIS Global- 54,000 Sq. ft.- 12 Cr- 90 Days
MasterCard- 58,000 Sq. ft.- 16 Cr- 90 Days
TS- Verse- 12,700 Sq. ft.- 4.6 Cr- 45 Days
K Raheja (Phase-02)- 7,600 Sq. ft.- 3.4 Cr- 45 Days
IKS Health- 72,000 Sq. ft.- 16 Cr- 90 Days
K Raheja (Phase-03)- 1,500 Sq. ft.- 0.74 Cr- 30 Days
Asian Paint- 67,000 Sq. ft.- 14.3 Cr- 90 Days
Certification
Microsoft Project (MSP)
AI-CIT
Industrial Automation
Timeline
Project Manager- MEP
ANJ Turnkey Project Pvt. Ltd.
05.2018 - Current
Electrical Site Engineer
Kilburn Engineering Limited
07.2017 - 04.2018
Junior Engineer
Goemeneasz India
09.2016 - 06.2017
Bachelor of Engineering - Electrical Engineering
University of Mumbai
Bachelor of Science -
State Board of Maharashtra
Microsoft Project (MSP)
AI-CIT
Industrial Automation