DINESH VIJAY KAKATKAR

Palava, Dombivali

Summary

Results-driven professional with experience Reliable worker with excellent communication, time management, and computer skills. A driven and detail-oriented individual with a desire to use analytical and problem-solving skills to meet goals.

Overview

19
19
years of professional experience

Work History

Sr. Manager

Adani Green Energy Limited
2022.12 - Current
  • Managing 600 MW ACDC Solar Works.
  • Successfully commissioned 600MW AC works in stipulated time.
  • Handled 625 kms LT cable laying, 48 IDTs,HT Panels, 570kms of DC cabling, 300kms of earthing works.
  • Managed 20+ vendors with peak manpower of 350+.
  • Coordinating with other departments for smooth operation.
  • Responsible for Quality and safety of works.
  • Successfully managed and developed a team of 20+ employees, demonstrating strong leadership skills.
  • Worked with senior management on strategy development and execution planning.
  • Utilized effective communication techniques to build relationships with stakeholders at all levels of the organization.
  • Provided strong leadership to enhance team productivity and morale.
  • Improved team performance by providing comprehensive training and fostering a collaborative work environment.

Deputy General Manager

Lodha Developers
2019.02 - 2022.02

Palava -2

  • Handled MEP Works for high rise buildings (G+18 storey),Sales gallery, school, Temple, Underground tank pump rooms.
  • Handled 26+ vendors and manpower of approx 150+
  • Managed daily operations including resource management, material tracking,etc.
  • Handled vendor billing, amendment.\
  • Approvals of MAS, MIR, IR from vendors.
  • Coordination with Design and Architects team.
  • Coordinated staff training sessions to ensure compliance with company policies and procedures.
  • Provided clear direction and set priorities for accomplishing desired actions and results.
  • Met safety and security standards.
  • Organized and guided activities such as installation methods of various items in coordination with other department.
  • Implemented effective strategies to reduce costs while maintaining quality standards.

Manager (Electrical)

Larsen & Toubro (Oman) LLC
2011.06 - 2019.01

W-Hotel, Muscat, Oman

(Nov 2015 - Jan 2019)

  • Worked as Electrical Incharge and handled end to end responsibility from preparations of shop drawings, material submittals, method statements,quantity certifications.
  • Also documentation such as raising technical queries, inspection request and material inspection.
  • Substation scheme approval from Authority.
  • Planning and monitoring the site progress, material follow up, vendor , material and manpower management,.
  • Initial testing of equiments such as DB, earthing, etc.
  • Procurement strategy planning and quantity, details and technical finalisation of items such as transformer, LV panels, cables, etc.
  • Co-ordination with lighting consultant, project consultant, clients,etc.
  • Orientated and trained employees, encouraging confidence and helping individuals adapt faster to job roles.
  • Monitored team productivity and performance to support goals.

Salalah Airport, Salalah, Oman.

(Worked as Assistant Construction Manager)

(Feb 2012 - Nov 2015)

  • Executed Electrical works for Passenger Terminal Buildings, Main Gate,etc.
  • Planned and executed the per day targets of laying G.I. Conduits - 1000 Rmts, 300 Mts cable tray, 300 Mts of Cable, 3kms of wire,etc.
  • Co-ordination with other MEP services, finishes and design.
  • Managed multiple teams working simultaneously on different activities of a single project.

Mix Used Development, Muscat, Oman.

(Worked as Assistant Construction Manager) (June 2011 - Feb 2012).

  • Planning of MEP works.
  • Preparation of JCR.
  • MAS submission
  • Preparing schedule of works.

Assistant Construction Manager

Larsen & Toubro Limited ECC Division
2008.04 - 2011.06

Wankhede Cricket Stadium, Mumbai,

India.

(Worked as Assistant Construction

Manager)

(Nov 2009 - Jun-2011)

  • Material follow up with vendor and HO.
  • Co-ordination with other services, Civil and finishes.
  • Execution of critical works with time management.

ESE Factory, Ahmednagar, India.

(Worked as Senior Engineer)

(April 2008- Nov 2009)

  • Site Incharge for Electrical works including MV, LV shops, Food Court building.
  • Handled vendor for material follow ups and planning of activities.
  • Executed and co-ordinated electrical works for G + 2 Storey Administration building which was awarded GOLD certification by IGBC.

Project Engineer

Sterling & Wilson Pvt. Ltd.
2006.11 - 2008.03

Calangute Mall , Calangute, Goa

  • Handled Electrical works for Calangute mall (shopping mall).
  • Coordinated with HO for material follow ups.
  • Co-ordination with client for approval and payments.
  • Vendor Management and daily planning and monitoring of site activities.
  • Subcontractor and client billing.

Trainee Engineer

Prabhu Enterprises
2005.10 - 2006.10

National Institute of Oceanography

  • Execution of electrical works for Colony and Institute building.
  • Executed rewiring, street lighting works.
  • Executed Measurement verification to client.
  • Measurement of executed works on daily basis.

Education

Bachelor of Engineering - Electrical & Electronics Engineering

Goa Engineering College
Farmagudi, Ponda, Goa
2005

Skills

  • Hard Working
  • Team leader
  • Data-driven decision-making
  • Result Oriented
  • Effective Communication

Languages

English
Advanced (C1)
Hindi
Advanced (C1)
Marathi
Advanced (C1)
Konkani
Advanced (C1)

Timeline

Sr. Manager

Adani Green Energy Limited
2022.12 - Current

Deputy General Manager

Lodha Developers
2019.02 - 2022.02

Manager (Electrical)

Larsen & Toubro (Oman) LLC
2011.06 - 2019.01

Assistant Construction Manager

Larsen & Toubro Limited ECC Division
2008.04 - 2011.06

Project Engineer

Sterling & Wilson Pvt. Ltd.
2006.11 - 2008.03

Trainee Engineer

Prabhu Enterprises
2005.10 - 2006.10

Bachelor of Engineering - Electrical & Electronics Engineering

Goa Engineering College
DINESH VIJAY KAKATKAR