To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
1.5 years
1.5 years
3.9 years
1.5 years
Ravet, Pune
Project 1:
Title: Flight Control System
Environment: ADSP 21469
Tested features: Software Low Level Testing/Unit Testing and Software Integration Testing.
Tools used: Vector cast (ver. 6.2), Understand C, MKS, DOORS, ClearQuest, BCompare.
Role: Verification and Validation
➢ Creating Test script and test cases as per the test plan.
➢ Setting up MC/DC Coverage.
➢ Configuring the Vector Cast settings to build the source code.
➢ Functional and Structural Testing.
➢ Detecting and Reporting defects.
➢ Creating Requirement Based Test Cases as per the test plan for each unit.
➢ Test Planning, Test Case design, Test development, Test execution using Vector Cast.
➢ Requirement coverage analysis, Structural Coverage analysis.
➢ Capturing the defects and reporting it.
➢ Generate Test results and Test Report.
➢ Problem Reporting, Change Request.
Title: Airbags, Seatbelts Tightners
Tools used: TKWinx, MM6x, Xflash, CANoe, DOORS, Clear quest, Lab Drive
Role: Validation
Customer: CEVT, Nissan
Responsibilities:
➢ Executing Test Cases as per the test Plan.
➢ Taking the trace of tests.
➢ Sending diagnostic services and checking as per the test plan.
➢ Detecting and Reporting defects.
➢ Generate test results.
Title: Electrical Hybrid Vehicle Powertrain System (EHV) Gen3, Gen3Evo - INV, Gen3Evo –DCDC
Tested features: Module Testing, HIL and Integration
Tools used: TPT, UDE, Ascet, ECU Test, INCA, ALM, AEEE, ETAS Lab Drive, Canoe
Role: Verification and Validation
Customer: BMW, Nissan, VW
Project Description:
● Electric Hybrid Vehicles use both fuel combustion engine as well as an electric source (Battery) as source of energy.
● The Electric source is a high voltage battery (~400V) which produces a Direct current. It is converted to AC with the help of an Inverter and delivers the required power to wheels using PMSM modeling.
● .It also consists of a DCDC Converter which step-down the High voltage (~400V) to Low voltage (~12V) and stores it in a battery which acts as power source for various other electronic equipment’s within the vehicle
There are 3 Levels for the software:
Level 1. Application Software (Driving Functions & Components monitoring) Level 2: Monitoring Level 1 software functionality
Level 3: Monitoring the hardware (Microcontrollers)
In case of any malfunction,
Level 1 software alarms the user using the Safe State and Availability request. Level 2 software re-checks the validity of the request.
Level 3 software monitors the hardware whether it’s working as expected or not.
➢ Reviewing design document as testers point of view
➢ Developing test specification.
➢ Test specification review.
➢ Writing test script.
➢ Test Script Review.
➢ Requirement coverage analysis.
➢ Structural code coverage analysis.
➢ Generate test results and test log.
➢ Delivering the module artifacts.
➢ Involved in assessment
Title: Electronic Brake Booster (EBB)
Tested features: Module in loop Testing (MIL), Component Testing, Software in loop (SIL) Testing, Coverage Testing
Tools used: MATLAB, Simulink, TPT, Target link
Role: Verification and Validation
Responsibilities:
➢ Reviewing design document as testers point of view
➢ Developing test specification.
➢ Test specification review.
➢ Writing test script.
➢ Test Script Review.
➢ Requirement coverage analysis.
➢ Structural code coverage analysis.
➢ Generate test results and test log.
➢ Delivering the module artifacts.
➢ Involved in assessment
Title: Electronic Parking Brake (EPB)
Role: Test Manager
Customer: Mazda, Suzuki, VW
Responsibilities:
➢ Regression analysis summary Approval (If Regression Testing) Controlling of test execution
➢ Tracking and documentation of regression tests due to Change Requests (CR’s)
➢ Controlling of tests performed by subcontractors
➢ Document releases.
➢ Monitoring of the test specification process
➢ Assignment of re-test CR’s to test level
➢ Monitoring of test execution.
➢ Consolidate the test reports from all test centers to one summary report with a release recommendation for the current delivery.(Test Summary Report)
➢ Ensuring Re-Test CRs are in correct state.
➢ Creating Design Verification Report.
Title: Diabolo Dual clutch Transmission
Tested features: Module in loop Testing (MIL), Smoke
Testing: Unit Testing,Vehicle Test
Tools used: MATLAB, Simulink, Excel simulation tool, SVN, Polarian, Canape, MLT
Role: Validation Lead
Responsibilities:
➢ Reviewing design document as testers point of view
➢ Requirement Review.
➢ Developing test specification.
➢ Test specification review.
➢ Writing test script.
➢ Test Script Review.
➢ Requirement coverage analysis.
➢ Generate test results and test log.
➢ Delivering the module artifacts.
I hereby declare that the information given by me is true to best of my knowledge.
ISTQB foundation Level Certified
Achieved Spot Award multiple times for my work in ZF.