Summary
Overview
Work History
Education
Skills
Software
Accomplishments
Timeline
Generic
Mohammad Abdul Haseeb

Mohammad Abdul Haseeb

Aircraft Manufacturing Engineer
Nashik

Summary

Experience of 18+ Years in Aerospace Manufacturing ,Assembly & Testing of fighter aircraft of Russian and Western Origin.


Results-driven Fighter Aircraft Assembly Engineer with a proven track record of excellence in assembling and testing cutting-edge fighter aircraft.


Adept at interpreting complex engineering drawings and specifications to ensure precision in assembly processes. Demonstrated expertise in optimizing assembly workflows, reducing production costs, and enhancing overall efficiency.


Proficient in collaborating with cross-functional teams to troubleshoot and resolve assembly challenges, ensuring timely delivery of high-performance aircraft. Committed to upholding the highest quality standards and implementing innovative solutions to improve assembly processes. Seeking to contribute my skills and experience to a dynamic aerospace team dedicated to advancing aviation technology.


Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success.


Encouraging manager ,Strong leader and analytical problem-solver with talents for team building, leading and motivating, as well as excellent customer relations aptitude and relationship-building skills. Proficient in using independent decision-making skills and sound judgment to positively impact company success. Dedicated to applying training, monitoring and morale-building abilities to enhance employee engagement and boost performance.

Overview

19
19
years of professional experience
4
4
Languages

Work History

Senior Manager, Final Assembly & Equipping

Hindustan Aeronautics Limited
7 2020 - Current
  • Scheduling the production activities related to assembly , modification and testing of state of the art 4.5th Generation fighter aircraft
  • Working as a project manager for implementation of Weapon Unification upgrade of fighter aircraft
  • Scheduling of the raw materials, standard parts and the RMA’s (Ready Made Articles)
  • Project implementation in different phases final assembly & equipping in a view to achieve business objectives and ensure optimum utilization of available resources
  • Understanding business process, studying and analyzing workflow to design solutions
  • Conducting GAP analysis & preparing Required Document for approval on various modification projects
  • Compliance of applicable QMS in the work area
  • Established first of kind Facility of loom/harness manufacturing for rotary wing aircraft at Aircraft Manufacturing Division Nasik as per the Quality Management system requirement by working on the pillars of man, material ,technology and quality
  • Studied various MIL standard documents for realization of loom harness manufacturing
  • Trained the manpower in the western platform harness manufacturing process to the manpower already acquainted with only Russian Platform loom manufacturing
  • Smoothened the production by identifying capacity limitations, bottlenecks and process problems
  • Deployed various methodologies to analyze various processes, recommending modifications, which has enhanced the operational efficiencies, controlled variability, reduced cycle-time and costs
  • Liaison with the licensor of the project for changes and amendments
  • Sequenced assembly shop activities in consultation with licensor representative
  • Developed framework of quality standards and smoothen implementation of the project
  • Conducted training programs time-to-time to enhance the skills of the staff & workforce and as a result gain improved productivity
  • Planned theoretical sequence of operations and specified procedures for the fabrication of tools, equipment and other facilities that affect product performance

Manager/Deputy Manager,Methods Engineering

Hindustan Aeronautics Limited
01.2013 - 6 2020
  • Handling the process planning activities of Loom manufacturing, Functional test laboratory, Final Assembly & Flight Hangar of SU-30MKI aircraft
  • Providing and implementing technical solutions in assigned areas
  • Production of assembly sequence of final assembly activities forSU-30MKI aircraft and its certification
  • Coordinating assembly shop activities & equipping shop activities during start up of production of aircraft
  • Drafting functional requirements for ERP systems using models and diagrams to represent the processes and functions involved
  • Integration with other modules, integration testing & extending Post Go-live support, including training support to end-users
  • Preparation of Bill Of Material [BOM], Standard Technical Instruction Master and Assembly Tooling Master
  • Preparation of assembly flow charts for all the assembly modules before actual beginning of the SU-30MKI project
  • Preparation of assembly technology for implementing newly released assembly drawings of various modifications and up gradation of aircraft
  • Document Management for Amendments in documents
  • Release and control of Technological Documents [Process Sheets] to various assembly sections.

Engineer/Assistant Engineer, Final Assembly

Hindustan Aeronautics Limited
12.2005 - 12.2012
  • Led a team of 40 technicians in assembly and testing of state-of-art fighter aircraft, ensuring compliance with engineering specifications and safety regulations
  • Improved team productivity by providing technical guidance and mentoring subordinates
  • Optimized engineering processes by implementing innovative solutions and streamlining workflow.
  • Performed preventative maintenance to keep tools and equipment functional.
  • Make the full circuit diagram of Loom and connector installation in final assembly of SU-30MKI Aircraft
  • Check all the Avionics Systems which includes AC/DC system, basic Electrical systems, Fuel System, Communication and Navigation system, Mechanical systems and identification of faulty items or processes on the aircraft
  • Co-ordinate with Customer agencies RDAQA and RCMA for approval of new modifications as well as meeting the RDAQA requirements
  • In addition to that my responsibilities includes developing and executing project and process plans, implementing policies and procedures, setting operational goals and acquiring resources
  • Provide oversight and approval of technical approaches, products and processes
  • Manage, develop and motivate employees
  • Work with Manufacturing Engineering, Liaison Engineering, Quality, Shared Services Group, Industrial Engineering and Manufacturing supporting engineering
  • Analyzes maintenance program to incorporate requirements originating from manuals, line maintenance inputs, quality circulars, reliability trends
  • Responsible for achieving the yearly production task
  • Deputation on temporary duties to various IAF bases to implement the latest modifications and rectification of snags of the electrical system of Su-30MKI aircrafts
  • Plan and execute the manpower & material for carrying out various jobs according to the schedule, to minimize the process down time by the application of Lean management

Education

B.E in Electronics & Telecommunication Engg -

Shri Guru Gobindh Singhji Institute of Engg. & Technology
Nanded, India
06.2005

Skills

  • Aircraft System Testing with troubleshooting and problem resolution
  • Aircraft Assembly and Integration
  • Aircraft Harness Manufacturing
  • Manpower management
  • Operations Management
  • Resource Allocation

Software

MS Excel™, MS PowerPoint™, MS Word™MS Project

Accomplishments

Received Promising Engineer Award 2022 confer by Institute of engineer for contribution in the field of Engineering.

Timeline

Manager/Deputy Manager,Methods Engineering

Hindustan Aeronautics Limited
01.2013 - 6 2020

Engineer/Assistant Engineer, Final Assembly

Hindustan Aeronautics Limited
12.2005 - 12.2012

Senior Manager, Final Assembly & Equipping

Hindustan Aeronautics Limited
7 2020 - Current

B.E in Electronics & Telecommunication Engg -

Shri Guru Gobindh Singhji Institute of Engg. & Technology
Mohammad Abdul HaseebAircraft Manufacturing Engineer