Singing
A highly motivated and skilled individual with 4+ Years’ experience in the field of Structural design, Drafting and Construction in Offshore Oil & Gas Chemical Industry.
PROJECT HANDLED
Project 1 : NOC RUYA EPC12
Client : North Oil Company.
Project 1 : CRPO-78
Client : Saudi Arabian Oil Company.
Working as Senior Designer for CRPO-78 project having facilities like to install additional export handling capacity at Juryman NGL Fractionation (JNGLF) to handle the increase in propane (C3) and butane (C4) products. One new piled steel platform with NGL offloading facilities for one tanker and provision for a future. NGL Ship Berth to accommodate 25,000 – 60,000 DWT NGL tanker ships. Platforms like -: Large breasting dolphins, Small breasting dolphins, Large mooring dolphin , Small mooring dolphin, Interconnecting walkways and supporting piles structure.
Project 2 : NLRNC-RT2
Client : ONGC
Working as Senior Designer for NLRNC-RT2 project having facilities like
The scope of work for the tender shall include in general but not limited to Surveys (pre-engineering, pre-construction/ pre-installation and post-installation) Design, Engineering, Procurement, Fabrication, Load out, Tie down / Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning(wherever applicable) of entire facilities as described in the bidding documents for New LQ & Revamp at NQ Complex Project on LSTK basis.
Project 3 : Cluster – 8
Client : ONGC
Working as JET for Cluster – 8 project having facilities like a. Fabrication and installation of B192-10, D30-2, B192-5A and WO24-3 platforms. b. Fabrication & installation of bridge from existing B192-5 platform to new B192-5A platform. c. Clamp-on for 03 nos. wells and modifications at existing B192-1 well platform including deck extension required as per equipment lay out plan.
Responsibilities:
- Working on Framing plan & elevations by using Sacs input.
- Working on battered Jacket framing & elevation along with Mudmat detailing & pile design drawing under guidance of Geo-tech engineers.
- Working in activities of analysis of structure whether tolerance of placing girder location making impact on whole structure.
- Working on Lifting padeye design drawings with different capacities.
- Involve in Mooring Dolphin QRH arrangement.
- Involve in transportation arrangement design drawings.
- Involve in miscellaneous structural aspects that fulfill the necessary action have to completed by individual structure.
- Preparation of drawing index.
- Preparation of structural design criteria
- Involve in activities of secondary framing plan
- Preparation of grating & plating
- Preparation of wind load calculation
E3D
Microstation
Auto-Cad
SACS Analysis
Staad-pro
Offshore Engineering Design
Navisworks
Singing
Dancing
Traveling exploring historic places