A highly accomplished and results-driven Construction Engineer with a distinguished 10-year 8 months career in the field, seeking a challenging and rewarding position that allows for the application of extensive expertise in project management, technical proficiency, and team leadership.Major Expirience 10 years in Metros and Rail Infrastructure Projects.
Overview
11
11
years of professional experience
Work History
Construction Engineer
BECHTEL
Neom Saudi Arabia (Remote)
5 2022 - Current
Managed the accountancy of 2 complex projects Namely Spine & Connector
Reviewing of Method statements, submittals which are uploaded in Aconex for excavation Implement activities including those of sub-contractors works in accordance with approved procedures, method statements and contract documents
Preparation of Daily progress report and monthly progress report
Engaging in the early works or preparatory works for railway embankments and piling works for bridges is critical in the construction of transportation infrastructure, especially for projects like NEOM's railway networking over viaducts and bridges
Supervising with core civil team in shaping up the excavation activities initially for the rail network connectivity of this prestigious project
Working with both the 'Spine' and 'Connector' teams within the NEOM project is an invaluable experience, given the significance of these components in shaping the overall development of the city-state
Being able to contribute your own inputs to bring the sites from scratch level to the working level demonstrates your expertise and proactive approach to problem-solving
Coordinating with the site execution team, particularly contractors, for all civil-related activities during the construction phase is a critical role in ensuring the successful implementation of a project like NEOM.
Reduced safety incidents by implementing comprehensive safety trainings and regular site inspections.
Deputy Manager
Tata Projects Ltd
Mumbai Underground Metro
11.2016 - 05.2022
Responsible for conducting geological investigations, including SPT, Packer Test, Permeability Test, and Pressure Meter Test
Responsible for constructing 3000 secant piles, standalone piles (King-Post), flair columns, RCC and structural deck slabs, and shaft and station excavation works, including base, concourse, roof, and additional step-up or step-down slabs
Preparing Bar Bending Schedules (BBS) and subcontractor Bills
Overseeing labor to ensure adherence to methods, quality standards, and safety protocols
Participating in project meetings for evaluating project progress and providing technical inputs
Assisting on utility diversion work, water-proofing work & backfilling of station box
Preparing monthly subcontractor bills or invoice, daily/weekly/monthly progress report
Reviewing method statements and preparing work specific quality control plans
Executing contracting works and working in vendor analysis and selection based on technical competencies
Responsible for the execution of station structures in accordance with provided drawings and Specifications.
Maintained, documented and presented progress reports to leaders.
Enhanced supervisory and leadership abilities by working closely with supervisor.
Improved team efficiency by streamlining processes and implementing innovative management strategies.
Identified areas for improvement within the department, implementing strategic initiatives to address gaps in performance or resources.
Oversaw daily operations of the department, ensuring maximum productivity and adherence to company policies.
Site Engineer
BGR Energy Systems Ltd
Orissa Power Generation Corporation, Jharsuguda
1 2016 - 11.2016
Execution of pre-treatment plant (clarifier, Clarifier Water reservoir, Demineralized Plant, Pipe rack) Excavation till Concreting
Preparing monthly subcontractor bills or invoice, daily/weekly/monthly progress report
Carrying out Inspection of the Materials received at site as per the data sheet and standards
The role or concerns if any
Assist in ironing out any operational hurdles and ensure smooth operations also involves participation in discussions with clients & consultants to understand their demands, issues.
Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
Civil Engineer
Gammon India Ltd
Chennai Underground Metro
09.2013 - 11.2015
Executing construction of concourse, roof & base slabs including fire fighter staircase some internal station rooms and diaphragm wall from excavation till concreting
Managing bottom-up construction of the station including excavation and strutting as well as rebar fabrication of diaphragm wall, slabs, walls etc
Working on reading design or drawing for structural details in coordination with Design Co-Ordinator (DMR and FCR) for underground machinery
Delegating work to fulfill the site requirements and avoiding delays to achieve the desired plan
Mapping gap analysis of the planned vs
Actual programme and representing the areas requiring attention or action of the project team
Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
Managed subcontractors effectively, promoting collaboration and ensuring adherence to project specifications.