Project Manager focused on renewable-energy delivery across wind, solar, substation, and transmission-line scope. Coordinates land acquisition, survey activity, contractor interfaces, and commissioning readiness to keep multiple workstreams aligned to schedule. Draws on electrical project execution, O&M, and utility coordination to manage complex program dependencies without losing site-level control.

Overview

4
4
Languages
3
3
Certifications
21
21
years of professional experience

Work History

Deputy General Manager

Sunsure Energy Private Limited
Pavagada, Karnataka
08.2026 - Current
  • Lead 400 MW hybrid project works at Pavagada across solar and wind execution milestones.
  • Lead execution of 400 MW hybrid solar-and-wind works at Pavagada in Tumakuru district.
  • Identify suitable land for solar installations and wind turbine generators to support project readiness.
  • Conduct preliminary and check surveys for 220 kV transmission line routing.

Project Manager

Kshema Power India Private Limited
Guntakal, Andhra Pradesh
04.2026 - 07.2026
  • Managed 54 km, 220 kV line construction from Palvai, Kalyandurgam to LB Nagar, Rayadurgam for the RPSG client.
  • Directed 20 km, 400 kV line construction from Hebbatam to Maddikera, Anantapur for the PGCIL line under the Evron client.
  • Oversaw high-voltage transmission work across two client assignments, reinforcing delivery across distinct route lengths and voltage classes.
  • Coordinated line construction activities for utility clients, aligning site execution with project requirements from start to finish.

Section In Charge, Wind Projects

JSW Renewables
Ghiyavad, Gujarat
10.2024 - 04.2026
  • Managed electrical BOP execution for the 250 MW Dolvi Phase II wind project, including project follow-up with contractors.
  • Coordinated route survey and related follow-up for the 220 kV EHV line tied to the 250 MW PSS scope.
  • Directed execution of the 566 MW UTKA-I and UTKA-II Latur wind projects across contractor coordination and site activities.
  • Oversaw the 68 MW GUVNL hybrid project at Ghiyawad, Gujarat, covering PSS construction, GSS bay work, and USS activities.
  • Led construction of the Kotda Nayni PSS, 17 kM EHV line, and associated GSS bay work for timely project delivery.
  • Handled execution of the 33 kV line and 36 kM line works for the Ghiyawad and UTKA project scopes.
  • Applied quality management systems and testing and commissioning discipline across wind project activities while coordinating contractor progress.

Senior Manager

Suzlon Global Services Limited
Anantapur, Andhra Pradesh
12.2022 - 10.2024
  • Oversee Operation and Maintenance of BOP of 1.7 GW wind farm across Andhra Pradesh and Telangana, coordinating daily site performance.
  • Manage 220/33 kV, 132/33 kV substations, HT yards, 2.3 MVA transformers, and 33 kV line maintenance across the wind farm network.
  • Plan maintenance shutdowns, major overhauls, and O&M implementation schedules to extend equipment life and support uninterrupted operations.
  • Drive asset management improvements, root-cause analysis, and corrective actions to reduce recurring defects and support safe operating limits.
  • Control budgets, forecast requirements, schedule expenditures, and analyze variances to improve cost discipline and resource utilization.
  • Coordinate with CEIG, Transco, and DISCOM authorities on EB issues, power evacuation planning, and site execution requirements.
  • Lead strategic reviews covering due diligence, risk audits, technology assessment, digital transformation, and SAP MM-supported planning activities.

Construction Manager

Senvion Wind Technology Pvt. Ltd.
Kutch, Gujarat
03.2019 - 12.2022
  • Managed project budgets, audits, forecasts, variance tracking, and corrective actions to support financial control.
  • Planned schedules, project baselines, resource deployment, and safety measures to keep work aligned with client and company requirements.
  • Coordinated land acquisition with local government bodies and maintained liaison with CEIG, Transco, and DISCOM authorities.
  • Supported power evacuation planning by coordinating approvals and utility interfaces for transmission-line and substation work.
  • Led 54 km, 220 kV line construction for RPSG and 20 km, 400 kV line construction for PGCIL client delivery.
  • Executed, monitored, and closed 100 MW SECI Alfanar project, 50.6 MW Alfanar project, 61.2 MW SECI Renew project, 29.9 MW Engie project, and 2.7 MW Senvion prototype.
  • Delivered 220/33 kV Alfanar substation and 220 kV EHV line testing and commissioning connected to 765/400/220 kV PGCIL Nirona Substation.

Business Development Manager

Sany Heavy Industry India Pvt. Ltd.
Pune, Maharashtra
02.2016 - 03.2019
  • Evaluated engineering methods for electrical projects, aligning execution choices with practical construction management needs.
  • Inspected construction materials and applied quality management systems to support preventative maintenance across project stages.
  • Supervised project activities against plans and specifications, identifying errors early and keeping work aligned to scope.
  • Coordinated land acquisition with local government bodies and private parties to support site readiness for development.
  • Steered power evacuation planning and load flow analysis while coordinating with CEIG, Transco, and DISCOM authorities.

Assistant Manager- Electrical

Welspun Energy Private Limited
Bijapur, Karnataka
02.2015 - 01.2016
  • Directed bay allocation coordination with KPTCL corporate office and CE, Bagalkot for 220 kV KPTCL substation approvals at Bijapur.
  • Managed construction, erection, testing, and commissioning of the 20 kM 220 kV transmission line from Manugoli to Bijapur KPTCL substation.
  • Oversaw construction, erection, testing, and commissioning of the 220/33 kV pooling substation at Manugoli, Bijapur District.
  • Directed execution of the 50 MW solar project connected at 66/33 kV bay at Gaurasamudra substation.
  • Coordinated with land department teams to secure NA conversion clearances from Tahsildar, DC, AC, and Town Planning offices.
  • Worked with KPTCL, Major Works Department, and HESCOM to align approvals, interfaces, and field execution across project stakeholders.
  • Applied quality management systems across wind and solar project activities to keep construction and commissioning work coordinated.

Senior Engineer- Machine External Electric Dept.

Wind World India Limited
Gadag, Karnataka
02.2012 - 02.2015
  • Led erection, testing, and commissioning of 220/33 kV and 110/33 kV substations across the wind farm network.
  • Managed operation and maintenance of 950 kVA transformers installed at each WEC and the 33 kV lines across the network.
  • Planned preventive maintenance and shutdown schedules to extend equipment life and reduce unplanned downtime.
  • Directed overhauls of equipment and installations, applying construction management discipline to restore reliable plant performance.
  • Performed root-cause analysis on defects and implemented corrective actions under quality management systems, safe operating limits, and environmental requirements.

Assistant Engineer

Power Grid Corporation of India Limited
Malkangiri, Odisha
04.2009 - 02.2012
  • Directed erection, installation, testing, and commissioning of equipment, including pre-commissioning and functional checks for lines and distribution transformers.
  • Handled preventive, breakdown, corrective, and predictive maintenance in the field, supporting operations and maintenance planning and execution.
  • Tracked maintenance records and field activity logs to support consistent documentation and follow-up on recurring equipment issues.
  • Applied quality management systems during testing and commissioning to support reliable equipment handoff and field readiness.
  • Supported power evacuation planning by coordinating line readiness, transformer checks, and commissioning follow-through during project closeout.

Third Party QA/QC Inspector

Industrial Inspection Services
Visakhapatnam, Andhra Pradesh
08.2006 - 03.2009
  • Performed third-party QA/QC inspections on vessel project activities, documenting findings and escalating deviations for correction.
  • Tracked inspection checkpoints through project records and maintained clear documentation for quality reviews and follow-up actions.
  • Supported testing and commissioning activities by verifying workmanship against construction quality standards and site requirements.

O&M Engineer

Suzlon Windfarm Services Limited
Chitradurga, Karnataka
10.2005 - 05.2006
  • Coordinated project management activities for windfarm service work, aligning schedules, site readiness, and execution steps.
  • Applied quality management systems to track work standards, inspection checkpoints, and corrective follow-up.
  • Supported testing and commissioning for windfarm equipment, including power evacuation planning and substation operations.

Education

Accelerated Senior Management Programme - Business Management

Indian Institute of Management
Tiruchirappalli
08-2026

Executive programme - Project Management

IIM Rohtak
12-2017

Master of Business Administration - Energy Management

Assam Down Town University
08-2017

Bachelor of Engineering - Electrical & Electronics Engineering

Andhra University
Eluru
04-2005

Skills

Project management

Construction management

Quality management systems

Operations & maintenance

Budgeting / cost control

Power evacuation planning

Substation operations

Transmission line execution

Testing and commissioning

SAP MM

Certification

Electrical Transient Analyzer Program (ETAP)

Personal Information

Date of Birth: 29th December 1979

TRAININGS ATTENDED

  • 20th National Training Course on Wind Energy, National Institute of Wind Energy, Chennai
  • On Earthing for Power Systems, conducted by PETCEE, Bangalore.
  • On Operation and Maintenance of Substation, conducted by PETCEE, Bangalore.
  • At Visakhapatnam steel plant in electrical repair shop.
  • At Visakhapatnam steel plant in Steel Melt Shop and Blast Furnace
  • At Ordnance Factory, Medak in Foundry

CAREER TIMELINE (Recent 4 Organizations)

  • 2026-Present M/S Sunsure Energy Private limited
  • 2026 M/S Kshema Power
  • 2022-2024 M/S JSW Energy
  • 2019-2022 M/S Suzlon Global Services Limited.

Timeline

Deputy General Manager

Sunsure Energy Private Limited
08.2026 - Current

Project Manager

Kshema Power India Private Limited
04.2026 - 07.2026

Section In Charge, Wind Projects

JSW Renewables
10.2024 - 04.2026

Senior Manager

Suzlon Global Services Limited
12.2022 - 10.2024

Construction Manager

Senvion Wind Technology Pvt. Ltd.
03.2019 - 12.2022

Business Development Manager

Sany Heavy Industry India Pvt. Ltd.
02.2016 - 03.2019

Assistant Manager- Electrical

Welspun Energy Private Limited
02.2015 - 01.2016

Senior Engineer- Machine External Electric Dept.

Wind World India Limited
02.2012 - 02.2015

Assistant Engineer

Power Grid Corporation of India Limited
04.2009 - 02.2012

Third Party QA/QC Inspector

Industrial Inspection Services
08.2006 - 03.2009

O&M Engineer

Suzlon Windfarm Services Limited
10.2005 - 05.2006

Bachelor of Engineering - Electrical & Electronics Engineering

Andhra University

Master of Business Administration - Energy Management

Assam Down Town University

Executive programme - Project Management

IIM Rohtak

Accelerated Senior Management Programme - Business Management

Indian Institute of Management
Sribalaji PudiDeputy General Manager