Summary
Overview
Work History
Education
Skills
Place Of Declaration
Personal data processing
Timeline
Generic
Ravikant Prasad

Ravikant Prasad

Assistant Project Manager (MEP)
Pune

Summary

TO build career in a Growing Organization, where I can get the opportunities to prove my abilities by Accepting, fulfilling the organizational goal and climb the career ladder through continuous learning and commitmens.

Overview

2
2
Languages
14
14
years of professional experience

Work History

MEP Assistant Manager

Dosti Realty
05.2024 - Current
  • Planning & monitoring the work of Mechanical / Electrical contractors /sub-contractors on site.
  • Monitor, Planning versus Progress.
  • Coordinate with the Planning Department for updating in master project plans and working out recovery plans in case of delays.
  • Coordinate the activities between various contractors and subcontractors.
  • Review and approve the monthly bills of the contractors.
  • Review variation requests and coordinate with the Procurement department for necessary actions.
  • Coordinate with the Facilities Management department for a smooth transition from contractor maintenance to in-house maintenance.
  • Shop Drawings, Material Submittals and Method Statements As-built Drawings Testing & Commissioning Procedures Operation & Maintenance Manuals, Handing/Taking over Documents.

MEP Assistant Manager

VTP Realty
01.2023 - 04.2024
  • Planning & monitoring the work of Mechanical / Electrical contractors /sub-contractors on site.
  • Monitor, Planning versus Progress.
  • Coordinate with the Planning Department for updating in master project plans and working out recovery plans in case of delays.
  • Coordinate the activities between various contractors and subcontractors.
  • Review and approve the monthly bills of the contractors.
  • Review variation requests and coordinate with the Procurement department for necessary actions.
  • Coordinate with the Facilities Management department for a smooth transition from contractor maintenance to in-house maintenance.
  • Shop Drawings, Material Submittals and Method Statements As-built Drawings Testing & Commissioning Procedures Operation & Maintenance Manuals, Handing/Taking over Documents.
  • Raise Non-Conformance Reports in case of deviations from specifications or industry best practices Witness 1st fix, 2nd fix and final fixes of installations. Witness Testing & Commissioning of all the Mechanical or electrical systems Coordinate with the in-house Design Management department on project Mechanical or Electrical issues.
  • Project Site: R2 – Pegasus Site, Pune
  • B1+G+ 22 Floors – T1 (Finishing Ongoing)
  • B1+G+ 27 Floors – T2 (Finishing & RCC Ongoing)
  • B1+G+ 27 Floors – T3 (Finishing & RCC Ongoing)
  • B1+G+ 22 Floors – T4 (Finishing Ongoing)
  • B1+G+ 22 Floors – T5 (Finishing Ongoing)
  • B1+G+ 27 Floors – T6 (Finishing & RCC Ongoing)

Senior MEP Engineer

CAPACITE INFRAPROJECT LTD.
08.2021 - 01.2023
  • P1+P2+P3+G+ 21 Floors – T1, T2 & T3 (RCC Going On)
  • P1+P2+P3+G+ 21 Floors – T4 (Completed)
  • P1+P2+P3+G+ 21 Floors – T5 (Completed)
  • P1+P2+P3+G+21 Floor – T6 & T7 (Finishing going on)
  • P1+P2+P3+G+20 & 22 Floor – T8 & T9 (Completed)

Project In charge (Electrical Infra)

SHIVMAYA INFRA ENERGY PVT LTD.
08.2019 - 08.2021
  • Project Lodha Palava Phase – 2 Dombivali East, Mumba
  • Project Site:
  • Sector- 4 10 (Mhada) Electrical Infra
  • T1-EVIVA (I,J,K,L,M,N,O,P) G +17 Floor (Completed)
  • T2- ORBANO 1 (A, B,C,D,E,F,G,H,) G +17 Floor (Completed)
  • T3-ORBANO 2 ( I,J,K,L,M,N,O,P,Q,R,S,T) G +17 Floor (Completed)
  • SECTOR- 10 (Mhada) ORCHIDE (A,B,C,D,E,F,G,H,I,J,K,L,M,N,O,P,Q,R,S,T) G+10 Floor (Completed)

Asst. Electrical Engineer (MEP)

LODHA GROUP
03.2019 - 07.2019
  • Project Lodha Developer UPPER THANE, Mumbai
  • Position: Asst. Electrical Engineer (MEP)
  • T1- SERENOO
  • T2-GREEN VILLA
  • T3-TREETOP
  • T4-ECOPOLISH
  • T5-TIARA
  • T6-WOODLAND

Site Engineer (MEP)

SAI BALAJI INFRA INDIA PVT LTD
08.2014 - 03.2019
  • Project Site: Sector- 3 (Internal 6 building) Dombivali (E)
  • REGALIA – A, G+17 Floor (Completed)
  • REGALIA – B, G+17 Floor (Completed)
  • REGALIA – C, G+17 Floor (Completed)
  • Elite- M, G+17 Floor (Completed)
  • Elite- O, G+17 Floor (Completed)
  • 13 no. of Tower completed permanent Electrical supply
  • Nature of Job (Previous Employer)
  • 22/0.433 KV Power Substation Augmentation and RMU of 22 KV VCB2000Amp. VCB 2000Amp to 630 Amp, Erection, Installation, Commissioning.
  • 11/0.433KV distribution substation and 22/0.433KV, 100,200,315,500,630KVA distribution Transformer Erection, Installation & Commissioning.
  • Monitoring and executing all temporary supply in construction DB in all under construction building.
  • Monitoring and executing all Infra worksite cable laying both HT & LT Network, Earthing, Feeder Pillar.
  • Monitoring and executing the works belong to cluster infra like Pumping Panel, small and power lighting circuit. Planning of work to be done on the day and day according to priority basis and assigning workers accordingly to the plan.
  • Ensure the proper maintained of equipment, adherence of safety regulation handling of workers.
  • Coordinate with Client for project need; understand them and convey to respective department if required.
  • Ensure the work is done according to quality norms.

Electrical Engineer

SAI SONS TECHNOCOM PVT. LTD.
05.2012 - 07.2014
  • Manufacturing of M.C.C., P.C.C., A.P.F.C., F.F.P., Light load panel, M.D.B. S.M.D.B. D.B & Test Board panels.
  • Testing of control panels like – Functional Test, Control Test, C.T. Polarity test, dielectric test and Insulation Resistance test through Meager and High voltage test trolley.
  • Inspection of switch board’s like General Arrangement of Panel
  • Maintenance of Electrical Panel, Switch Board.
  • Improvement of electric circuit diagram and control panels.
  • Preparing the BOM (Bill of material) for the Board.
  • Material Planning for Assembling Panel, Bus bars as well as Switch gear and other electrical related material. Solving Quality related and electrically related issues comes in the board.
  • Good knowledge of induction motors, star delta starters, Dol starters, forward Reverse connections, interlocking of motors, and electrical panel.
  • Familiar with contactors, MCB, MCCB, MPCB, ACB, Circuit Breakers, power supply distribution.
  • Good Knowledge of Selection of Wire, Cable, Fuses nSwitches.
  • Finding the fault comes during testing of the switch boards
  • Coordinate with Client for project need; understand them and convey to respective department if required.
  • Ensure the work is done according to quality norms.
  • SAISONS TECHNOCOM PVT. LTD. Bhiwandi (MUMBAI)

Electrical:

  • Have hands on experience on the procurement, installation and testing & commissioning Electrical Distribution Systems, Alternate/Emergency Power Supplies, Lighting & Small Power Systems and Earthing and Lightning Protection, 22kv/433v Switching station. Data and Telephone Systems Building Management Systems and Home Automation System.

Plumbing/ Fire Fighting & HVAC:

  • Water Distribution Networks, Pumps, Plumbing Pipe Works in Trenches, Structures related to Plumbing/Drainage, Water Storage, Plumbing for Gases, Internal/External/Surface Drainage. Fire Detection and Alarm, Security Systems. Sewage Treatment Plant, Commissioning of Plumbing Systems. Ventilation system & ducting.

Education

Bachelor of Science - Electrical Engineering

PUNJAB TECHNICAL UNIVERSITY
India
04.2001 -

Intermediate - undefined

U.P. BOARD
01-2007

Matriculation - undefined

U.P. BOARD
01-2005

Skills

MEP Coordination

Coordination with consultants

Teamwork and collaboration

Problem-solving

Microsoft office

Auto CAD

Decision-making

Time management

Project management abilities

Place Of Declaration

Pune, Maharashtra

Personal data processing

I hereby declare that all information given above is true to my knowledge and belief and I hold all sole responsibility for its authenticity.

Timeline

MEP Assistant Manager

Dosti Realty
05.2024 - Current

MEP Assistant Manager

VTP Realty
01.2023 - 04.2024

Senior MEP Engineer

CAPACITE INFRAPROJECT LTD.
08.2021 - 01.2023

Project In charge (Electrical Infra)

SHIVMAYA INFRA ENERGY PVT LTD.
08.2019 - 08.2021

Asst. Electrical Engineer (MEP)

LODHA GROUP
03.2019 - 07.2019

Site Engineer (MEP)

SAI BALAJI INFRA INDIA PVT LTD
08.2014 - 03.2019

Electrical Engineer

SAI SONS TECHNOCOM PVT. LTD.
05.2012 - 07.2014

Bachelor of Science - Electrical Engineering

PUNJAB TECHNICAL UNIVERSITY
04.2001 -

Matriculation - undefined

U.P. BOARD

Intermediate - undefined

U.P. BOARD
Ravikant PrasadAssistant Project Manager (MEP)