Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Tushar Pawar

Dhule

Summary

Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

10
10
years of professional experience

Work History

Field Engineer

Reliance Jio Infocomm
03.2021 - 03.2024
  • Improved project efficiency by implementing advanced troubleshooting techniques and optimizing equipment performance.
  • Enhanced client satisfaction by providing timely and accurate technical support for complex issues.
  • Assisted in design of new systems, contributing to overall success of engineering projects.
  • Contributed to successful bids for new contracts by presenting compelling technical demonstrations to potential clients.
  • Manage Vendor, Supervisor in cluster to guide them for timely quality project execution.
  • Create MIN & manage material, Hands on GIS & K2 portal, Preparing Billing documentation, Manage local authority
  • Developed comprehensive reports documenting field activities, findings, and recommendations for improvement.
  • Performed root cause analysis on equipment failures, identifying areas for improvement and reducing repeat incidents.
  • Hired and supervised subcontractors to improve production and meet critical deadlines.

Project Engineer

Smit Construction
12.2016 - 02.2020
  • Reduced project timelines with proactive planning and close monitoring of progress.
  • Negotiated contracts with suppliers to secure favorable terms, resulting in cost savings for the company.
  • Identified risks and implemented mitigation strategies, minimizing potential issues during the project lifecycle.
  • Trained junior engineers in workstation design and material handling.
  • Manage Team leaders, engineers in the cluster to guide them for timely quality project execution.
  • Controlled site maintain cost by creating and following checklist for field team. Exact estimation of material requirement and work planning for new site implementation.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.

Site Engineer

Patil Enterprises
09.2014 - 09.2016


  • Execution & Planning of Fiber work Like
  • Trenching, Ducting, Backfilling, Blowing
  • FDMS Termination, Splicing
  • OTDR & LSPM
  • Horizontal Directional Drilling(HDD)
  • ROW Permission
  • Route Survey
  • Joint Survey
  • SUE Survey
  • Work Measurement & Billing
  • Manhole installation
  • Route HOTO
  • Manage Team leaders, engineers in the cluster to guide them for timely quality project execution

Education

Bachelor of Engineering - Electronics And Telecommunication

R.C.PATEL Institute of Technology, Shirpur.
Shirpur, India
07.2014

HSC - Science

J.R.City High School & Junior College,Dhule
Dhule, India
02.2007

SSC -

J.R.City High School & Junior College,Dhule.
Dhule, India
03.2005

Skills

    • Team Communication
    • Quality Assurance
    • Quality Control
    • Problem Resolution
      • Analytical Thinking
      • Equipment Installation
      • Site Inspections

Languages

Marathi
Hindi
English

Timeline

Field Engineer

Reliance Jio Infocomm
03.2021 - 03.2024

Project Engineer

Smit Construction
12.2016 - 02.2020

Site Engineer

Patil Enterprises
09.2014 - 09.2016

Bachelor of Engineering - Electronics And Telecommunication

R.C.PATEL Institute of Technology, Shirpur.

HSC - Science

J.R.City High School & Junior College,Dhule

SSC -

J.R.City High School & Junior College,Dhule.
Tushar Pawar